This notice was sent in by member Opie;

All Toronto-bound lanes on the section of the Skyway Bridge in Burlington will be closed for construction on a number of occasions this year so expansion joints can be replaced on the structure.

The first two full mainline closures this year are scheduled for Saturday, May 5 and 12 at 9 p.m. through to 10 a.m. the next day.

All lanes on the eastbound, or Toronto-bound QEW on the Skyway Bridge will be fully closed. Toronto-bound traffic will be detoured through Eastport Drive and be merged back onto the QEW at North Shore Boulevard

Full article;
https://www.insidehalton.com/news-s...toronto-bound-lanes-to-be-closed-for-repairs/
 

scotto

Administrator
Staff member
Feb 15, 2004
6,985
218
63
The Beach Strip
#2
Construction notice

QEW – Burlington Bay Skyway NBL (Toronto bound)
As agent of the Ontario Ministry of Transportation (MTO), AECOM. is providing Construction Administration services for MTO Contract 2016-2046, which consists of Rehabilitation of the Burlington Skyway Bridge Toronto-bound Lanes, Paving and Electrical.
The Prime Construction Contractor is Innovative Civil Constructors Inc.
UPCOMING LANE CLOSURES
Contract 2016-2046 QEW/Burlington Bay Skyway (Toronto-Bound/East Bound) construction involves the replacement of expansion joints on the structure. The work requires multiple full lane closures of the QEW/Burlington Bay Skyway (Toronto-Bound) this year. All lanes on East Bound QEW/Burlington Bay Skyway (Toronto-Bound) will be fully closed. At the time of these full closures Toronto-Bound traffic will be detoured through Eastport Drive. Traffic will be able to merge back onto the QEW at North Shore Blvd.
QEW Niagara-Bound traffic will not be affect by these closures.
To help assist the flow of traffic on Eastport Drive during the full mainline closure, access to Beach Blvd. from Van Wagners Beach Road and Eastport Drive will be restricted to local traffic only. Police officers will be posted at these locations to assist with the traffic control.
The first two scheduled full mainline closure of QEW/Burlington Bay Skyway (Toronto-Bound) are scheduled for Saturday May 5 and Saturday May 12, 2018, beginning at 9pm Saturday and continue through to 10am Sunday. After 10am Sunday, traffic will not be detoured along Eastport Drive and traffic will resume on the QEW/Burlington Bay Skyway (Toronto-Bound).
If you have any questions or require further information, please contact:
Mr. Mitch Gurdin, rcca
Contract Administrator
AECOM
Office Phone: (289) 389-9422
E-mail: 2016-2046@aecom.com
 

scotto

Administrator
Staff member
Feb 15, 2004
6,985
218
63
The Beach Strip
#3
Reduced (Lift) bridge openings during Skyway Closure

Please be advised that during the full closures of the QEW, Skyway Bridge as outlined below, and at the request of the Ministry of Transportation, the Burlington Canal Lift Bridge will operate for pleasure craft at the top of the hour only, during the full closures .

“In order to facilitate the removal, reconstruction and placement of the expansion joints on the bridge, lane closures and full closures (weekend nights) are required and detailed in the contract documents. Lane closures are detailed in SP100F08, they typically occur between 7pm to 5am (a little longer on the weekends) and the full closures occur on the weekend nights (Friday, Saturday and Sunday) between 10pm to 8am (till 4 am on Mondays). These full closures have occurred in the past during construction of expansion joints on the Niagara Bound QEW Burlington Bay Skyway. MTO has learned from that experience and improved signing, detours and consultation with affected stakeholders.

At a site meeting last week, the contractor informed us that their 1st planned full closure is Saturday, May 5 (closure to occur from Saturday night to Sunday night) and a second full closure is planned for Saturday, May 12 (closure to occur from Saturday night to Sunday night), weather permitting.”
 

scotto

Administrator
Staff member
Feb 15, 2004
6,985
218
63
The Beach Strip
#4
Good Afternoon,



Please be advised that the tentative Full Mainline Closure scheduled for this coming weekend, July 6th 2018, has been cancelled.



There will be a total of 16 full mainline closures occurring for the remainder of the year. They are as follows:

July 20th, 21st, 27th and 28th.

August 10th, 11th, 17th and 18th.

September 7th, 8th, 14th, 15th, 21st, 22nd, 28th and 29th.



If any of these dates are unused or the work postponed, a follow up email will be sent on the applicable week.



Thank you,



Arlind Qatipi
Project Manager
T: 905.637.0004
C: 416.998.5905
E: arlind.qatipi@ic2i.ca
3455 Landmark Road
Burlington • L7M 1T4 • ON • Canada
 