This notice was sent in by member Opie;
All Toronto-bound lanes on the section of the Skyway Bridge in Burlington will be closed for construction on a number of occasions this year so expansion joints can be replaced on the structure.
The first two full mainline closures this year are scheduled for Saturday, May 5 and 12 at 9 p.m. through to 10 a.m. the next day.
All lanes on the eastbound, or Toronto-bound QEW on the Skyway Bridge will be fully closed. Toronto-bound traffic will be detoured through Eastport Drive and be merged back onto the QEW at North Shore Boulevard
Full article;
https://www.insidehalton.com/news-s...toronto-bound-lanes-to-be-closed-for-repairs/
All Toronto-bound lanes on the section of the Skyway Bridge in Burlington will be closed for construction on a number of occasions this year so expansion joints can be replaced on the structure.
The first two full mainline closures this year are scheduled for Saturday, May 5 and 12 at 9 p.m. through to 10 a.m. the next day.
All lanes on the eastbound, or Toronto-bound QEW on the Skyway Bridge will be fully closed. Toronto-bound traffic will be detoured through Eastport Drive and be merged back onto the QEW at North Shore Boulevard
Full article;
https://www.insidehalton.com/news-s...toronto-bound-lanes-to-be-closed-for-repairs/