Notification of Traffic Configuration Changes
Burlington Lift Bridge(Burlington/Hamilton)
Please be advised that as of January 2, 2007 to March 2, 2007, FACCA Incorporated will be doing a sidewalk replacement project on the Burlington Lift Bridge.
As a result, the traffic configuration on the bridge will be reduced from the existing four (4) lanes with two lanes in each direction to two (2) lanes with one lane in each direction.
The lane reductions may cause some additional congestion at the structure and want to notify your organization so they may govern accordingly.
If you have any questions or concerns, please do not hesitate to contact the undersigned.
Thank you and have a good day.
FACCA Inc.
Robert Coulombe, Project Manager (905) 407-7607 cell.
Burlington Lift Bridge(Burlington/Hamilton)
Please be advised that as of January 2, 2007 to March 2, 2007, FACCA Incorporated will be doing a sidewalk replacement project on the Burlington Lift Bridge.
As a result, the traffic configuration on the bridge will be reduced from the existing four (4) lanes with two lanes in each direction to two (2) lanes with one lane in each direction.
The lane reductions may cause some additional congestion at the structure and want to notify your organization so they may govern accordingly.
If you have any questions or concerns, please do not hesitate to contact the undersigned.
Thank you and have a good day.
FACCA Inc.
Robert Coulombe, Project Manager (905) 407-7607 cell.